BS 7671 Amendment 4 (2026) Explained in Simple Words

BS 7671:2018+A4:2026 explained simply: when it was published, when the old version was withdrawn, and what changed for batteries, PoE and inspections.

3 min read · 20 November 2026 · RoomPlot Team

The UK wiring regulations changed again in 2026. Amendment 4 to BS 7671:2018 was published on 15 April 2026 and is now the current edition. This guide explains, in plain words, what changed, when, and what it means for the electrical plans you draw.

BS 7671The road to Amendment 4 2022 Amendment 2 AFDD and socket RCD changes 15 Jan 2026 A4 announced IET and BSI publish details 15 Apr 2026 A4 published Can be used straight away 15 Oct 2026 Transition ends Earlier version withdrawn
From Amendment 2 in 2022 to Amendment 4: announced in January 2026, published on 15 April 2026, with the earlier version withdrawn on 15 October 2026.

Key takeaways

  • Amendment 4 to BS 7671:2018 was published on 15 April 2026.
  • The transition period ended on 15 October 2026.
  • It adds requirements for stationary batteries and a new Section 716 for Power over Ethernet.
  • Certificates and plans should reference the current edition.

The dates

  • 15 January 2026: the IET and BSI announced Amendment 4.
  • 15 April 2026: Amendment 4 was published and could be used straight away.
  • 15 October 2026: the transition period ended and the previous version was withdrawn, according to the IET and training bodies.

Amendment 3 (2024) has been folded into the main text, so there is now one document to work from.

AMENDMENT 4What is new, at a glance NEW AND EXPANDED A new chapter for stationary secondary batteries Requirements for Power over Ethernet and ICT Major update to medical locations Amendment 3 folded into the main text ALSO UPDATED, PER IET SUMMARIES Firefighter's switches Periodic inspection and testing Closer alignment with IEC and CENELEC documents
What Amendment 4 adds, at a glance.

What changed, in simple words

  • Batteries get their own chapter. Home and commercial battery storage now has dedicated requirements for stationary secondary batteries.
  • Power over Ethernet and ICT. A new Section 716 covers data cabling that also carries power, such as for cameras and Wi-Fi access points.
  • Medical locations have been substantially updated.
  • Firefighter's switches and periodic inspection were listed for changes in the IET's preview of the amendment, along with closer alignment with international standards. Check the final text for the detail.

What it means for your plans

  • Show battery locations clearly, and check them against the new requirements and PAS 63100.
  • Treat PoE data runs as part of the installation: draw them, name them and keep them apart from mains routes.
  • Make sure certificates and plans reference the current edition from now on.

Check the rules. This is a plain-language overview from published summaries by the IET, BSI and training bodies. Always design to the published text, which is available from the IET and BSI.

Frequently asked questions

Is Amendment 4 a new edition of the wiring regulations?

It is an amendment to the 18th Edition, BS 7671:2018, and it is the current version to work to.

Do existing installations have to be upgraded?

No. An amendment applies to new work and alterations. Existing installations are assessed for safety at periodic inspection.

Where can I get the regulations?

From the IET and BSI. Summaries are helpful, but always design to the published text.

Free lesson. Want the full picture? UK rules for electrical plans is part of our free electrical floor plans course, with interactive exercises.

Sources

Plan it on your phone. Draw plans that show batteries, data and circuits clearly, ready for the current edition. Download RoomPlot on the App Store and draw your first electrical plan in minutes, or see what it does on our electricians page.

Related guides

Electricians AFCI Requirements Explained: Which Rooms Need Arc-Fault Protection AFCI protection explained for US homes: what an arc fault is, the NEC 210.12 room list, what happens when you extend a circuit and how to plan it. 3 min read Electricians Consumer Unit Replacement in the UK: What Is Involved and What a Good Quote Includes Replacing a fuse box in the UK: what a modern consumer unit includes, the testing and certificates involved, Part P notification and how a circuit plan helps. 4 min read Electricians Cooker Circuit Guide: Cable Size, Diversity and the Cooker Switch UK cooker circuits explained: how diversity turns a 12 kW cooker into a 32 A circuit, typical cable sizes, where the cooker switch goes and how to draw it. 3 min read
Browse all guides