Every distribution board needs a schedule that tells the next person what each way does. The best schedules are written straight from the electrical floor plan, so the labels on the board, the chart on the door and the drawing all use the same names. This guide shows how to build one.
What the schedule needs to show
BS 7671 expects a durable diagram, chart or schedule at or near each distribution board. In practice, a good one gives every way:
- The circuit number and a plain description of what it feeds.
- The type and rating of the protective device, for example a B32 RCBO.
- The cable size and type.
- The points served, so a fault can be traced quickly.
Key takeaways
- Every distribution board needs a durable schedule that says what each way feeds.
- Name circuits on the plan exactly as they appear on the board.
- One RCBO per circuit keeps a fault local and the schedule simple.
- When a circuit changes, update the plan first and then the schedule.
A sample schedule
This is the schedule for the sample house used across our electrician guides:
| Way | Circuit | Device | Cable | Serves |
|---|---|---|---|---|
| C1 | Lighting | B6 RCBO | 1.5 mm² | All lights, alarm supply |
| C2 | Kitchen ring | B32 RCBO | 2.5 mm² | Worktop sockets, appliance spurs |
| C3 | Sockets ring | B32 RCBO | 2.5 mm² | Bedroom and hall sockets |
| C4 | Cooker | B32 RCBO | 6 mm² | Cooker control unit |
| C5 | Garage radial | B20 RCBO | 2.5 mm² | Garage sockets |
| C6 | EV charger | B32 RCBO | 6 mm² | Charge point (DC fault protection) |
Ratings like these are typical for a small house, not a design. Size each one from the load, the cable length, the installation method and voltage drop.
Why one RCBO per circuit
With 30 mA RCD protection now expected on most domestic circuits, many installers fit an RCBO to every way. A fault then trips only its own circuit instead of half the house, and the schedule stays simple: one way, one circuit, one colour on the plan.
Tip. Name each circuit on the plan exactly as it will appear on the board, for example "C2 Kitchen ring". RoomPlot carries circuit names and colours into the exported legend and cable schedule, so the drawing and the door chart never disagree.
Common mistakes
- "Sockets 1" and "Sockets 2". Say which rooms each circuit feeds, so a fault can be traced without testing everything.
- A schedule that disagrees with the plan. Use the same circuit names in both, from the start.
- Missing spare ways. Leave room on the board, and on the schedule, for the circuits that will come later.
- Handwritten labels that fade. The schedule should be durable and stay legible for the life of the installation.
Keep it current
When a circuit is added or altered, update the plan first, then the schedule. Because the plan lives in one project, the next export already carries the change. Read more guides for the trade on our electricians page, or see how to build a full PDF report.
Frequently asked questions
What should a circuit schedule include?
The circuit number and description, the type and rating of the protective device, the cable size and the points served.
Is a circuit chart a requirement?
BS 7671 expects a diagram, chart or schedule at or near each distribution board so that circuits can be identified.
What does B32 mean on a breaker?
B is the trip curve, which suits ordinary domestic loads, and 32 is the rated current in amps.