Many building departments ask for an electrical plan with a permit application for a remodel, an addition or a new home. It does not need to be an engineer's drawing. It needs to be clear, to scale and complete enough for the plan reviewer to see that the work will meet code. Here is what they usually look for.
Key takeaways
- Requirements vary by jurisdiction: start with your building department's checklist.
- The plan shows every room to scale with receptacles, switches, lights and a symbol legend.
- Mark GFCI and AFCI protection, the panel location and smoke and carbon monoxide alarms.
- A circuit list and a load calculation usually go with the drawing.
Step 1 - Get the local checklist
Each city or county decides what it wants to see, and which edition of the code it enforces. Most publish a submittal checklist. Some accept a hand sketch for small jobs. Others want a scaled plan on a specific sheet size. Many let homeowners pull a permit for their own home.
Step 2 - Draw the floor plan to scale
Show walls, doors, windows and fixed items such as cabinets, the range, the water heater and bathtubs. A scale of 1/4 in to 1 ft is the residential standard. Label each room. If you can scan the rooms with a phone, the measuring is done for you.
Step 3 - Add the devices
- Receptacles, following the spacing rules: no point along a wall more than 6 ft from one in living areas, and the tighter rules for kitchen countertops.
- Switches, with a line or curve from each switch to the lights it controls.
- Lighting outlets in every room, hallway and stairway.
- Smoke and carbon monoxide alarms where the building code requires them.
- Special outlets: range, dryer, EV charger, air conditioning.
Step 4 - Mark the protection
Label receptacles that need GFCI protection, and note which circuits are AFCI protected. Mark weatherproof receptacles outdoors.
Step 5 - Show the panel
Place the panel and any subpanel, with the 30 by 36 in working space in front. Note the service size, for example 200 A.
Step 6 - Add the legend and circuit list
A legend explains every symbol on the sheet. A circuit list, or panel schedule, gives each circuit a number, breaker size, wire size and description. For additions and service changes, reviewers often ask for a load calculation as well.
Check the rules. States and cities adopt different editions of the NEC, often with local amendments. This guide is a plain-English summary based on recent editions. Always check the edition your jurisdiction enforces and ask your inspector when in doubt.
Doing it on a phone or tablet
RoomPlot covers the drawing side of this: scan or draw the rooms to scale, place symbols from the electrical library, link switches to lights, colour each circuit and export a PDF with the legend on the sheet. The load calculation and the code decisions stay with you or your electrician.
Tip. Call the building department before you draw. Five minutes on the phone tells you the code edition, the sheet size and whether they accept digital submissions.
Frequently asked questions
Do I need an electrician to draw the plan?
Not always. Many jurisdictions accept a clear plan drawn by the homeowner or contractor for residential work. The work itself may need a licensed electrician.
What scale should an electrical plan be?
1/4 in to 1 ft is the usual scale for residential floor plans in the US.
Do I have to show wire routes?
Usually not for a permit. Reviewers want device locations, circuits and protection. Routes are useful for your own material estimate.
Free lesson. Want the full picture? Drawing the base plan is part of our free electrical floor plans course, with interactive exercises.
Sources
- NFPA 70, National Electrical Code: free online access and development
- NFPA: NEC adoption maps by state
- International Code Council: codes and standards
- Electrical Safety Foundation International (ESFI)
Plan it on your phone. Scan the rooms, place the symbols and export a permit-ready plan with its legend. Download RoomPlot on the App Store and draw your first electrical plan in minutes, or see what it does on our electricians page.