A home EV charger is one of the biggest single loads a house will ever have, and it brings its own section of the wiring regulations with it. Putting the charger, its dedicated circuit and the rest of the garage electrics on one plan makes the design easy to price, approve and install. This guide covers what that plan should show.
The charge point circuit
- Dedicated circuit: each charge point gets its own final circuit from the consumer unit.
- Rating: a typical 7 kW single-phase charger draws 32 A, commonly wired in 6 mm² cable, but the size depends on the route length, installation method and voltage drop.
- RCD protection: BS 7671 Section 722 calls for at least a Type A 30 mA RCD, plus protection against DC fault currents above 6 mA. That is either a Type B RCD or a residual DC detecting device (RDC-DD), which many chargers include.
- Earthing: on TN-C-S supplies the design has to deal with the risk of a broken PEN conductor, often by open PEN detection built into the charger.
Key takeaways
- Each charge point has its own dedicated circuit from the consumer unit.
- A typical 7 kW single-phase charger draws 32 A.
- The circuit needs RCD protection that also deals with DC fault currents.
- Draw the car in its parking position first, then place the charger where the lead reaches.
Where the charger goes
Mount the charger where the cable reaches the car's charging port without stretching across the floor, and away from where the car door or a bin will hit it. Draw the car in its parking position on the plan, place the charger, then draw the route from the consumer unit. The length on plan, plus an allowance for the drop down the wall, gives you a realistic cable figure for voltage drop and for the quote.
The rest of the garage
Garage sockets are often a 20 A radial in 2.5 mm² cable. Add ceiling lights linked to a switch by the door with Connections, and an outdoor light by the garage door. If the garage is integral to the house, many designers also add a heat alarm interlinked with the alarms in the house.
Check the standard. EV charging requirements sit in BS 7671 Section 722 and change between amendments. Check the current edition, the charger manufacturer's instructions and any notification the network operator needs before installation. In Great Britain, new home chargers also have to meet the smart charge point rules.
Common mistakes
- Sharing a circuit. A charge point needs its own final circuit, not a spur off the garage sockets.
- Ignoring the route length. A long run to a detached garage can push voltage drop past the limits.
- Charger on the wrong wall. Draw the car first, with its charging port, so the lead reaches without crossing the walkway.
- No record of DC fault protection. Note on the plan whether it is provided by the charger or by the RCD.
Show the client what they are paying for
Export the garage as an image for the customer and a branded PDF report with the legend and cable schedule for your own records. If the job spans the garage and the house, keep both on one project with multiple floors. More trade guides are on our electricians page.
Frequently asked questions
What size cable does a 7 kW EV charger need?
6 mm² is common, but the size depends on the length of the run, how the cable is installed and the voltage drop.
Can an EV charger be spurred off the garage sockets?
No. A charge point needs its own final circuit.
Does the network operator need to be told?
Yes. Home charge point installations are notified to the distribution network operator, and some need agreement in advance. The installer normally handles this.