A garden office needs more than an extension lead through a window. It needs a properly protected supply from the house, buried safely, with its own small consumer unit. Planning the route on a drawing first saves digging twice.
Key takeaways
- The supply is normally a steel wire armoured (SWA) cable from the house consumer unit to a small unit in the office.
- The cable is sized for the load and the length of the run, because voltage drop grows with distance.
- The designer chooses whether to extend the house earth or give the office its own earth electrode.
- A new circuit to an outbuilding is notifiable work in England and Wales.
Step 1 - List the load
Write down what the office will run: lighting, sockets for computers, and above all heating. A 2 kW panel heater changes the cable size more than everything else combined. Air conditioning or a workshop machine changes it again.
Step 2 - Choose the route
Measure the run from the house consumer unit to the office, including the distance inside the house. Keep clear of drains, tree roots and future building work. Armoured cable is buried deep enough to avoid damage from normal gardening, commonly around 500 mm or more, on a bed of sand with warning tape laid above it. It can also be clipped along a permanent wall.
Step 3 - Size the cable
The cable must carry the load and keep voltage drop within limits over the whole length. Long garden runs often need a larger cable than the current alone would suggest. This is a calculation for the electrician, using the measured route length.
Step 4 - Decide the earthing
Many houses have a PME supply. Taking that earth out to a building in the garden is a design decision, and the alternative is to make the office a TT installation with its own earth rod and RCD protection. The right answer depends on the site, and it is the designer's call.
Step 5 - The office consumer unit
A small unit in the office gives local isolation and separate protection for lighting and sockets, with 30 mA RCD protection. At the house end, the sub-main has its own protective device in the main consumer unit.
Check the rules. This is an overview for planning. The design, installation and certification are work for a registered electrician, and the job is notifiable under Part P in England and Wales.
Do not forget data
Wi-Fi rarely reaches the end of a garden reliably. Lay a duct for a data cable in the same trench, kept separate from the power cable, while the ground is open.
Draw it before you dig
Sketch the house wall, the garden and the office in RoomPlot, then draw the cable route as a dashed line. The app totals the length on plan, which gives the electrician the number they need for the cable calculation and gives you a record of where the cable is buried.
Frequently asked questions
Can I run a garden office from an extension lead?
Not as a permanent supply. Extension leads are not designed for continuous outdoor use or for heating loads.
How deep should armoured cable be buried?
BS 7671 asks for a depth sufficient to avoid damage. Around 500 mm or more is common in gardens, with warning tape above the cable.
Do I need planning permission for the electrics?
Planning permission concerns the building. The electrical work is covered by the Building Regulations, and a new circuit to an outbuilding is notifiable.
Free lesson. Want the full picture? Cable routes and schedules is part of our free electrical floor plans course, with interactive exercises.
Sources
- IET: BS 7671, the Wiring Regulations
- GOV.UK: Approved Document P, electrical safety in dwellings
- Planning Portal: Outbuildings
- Electrical Safety First: Best Practice Guides
Plan it on your phone. Plan the trench route, read off the cable length and keep a record of where the supply is buried. Download RoomPlot on the App Store and draw your first electrical plan in minutes, or see what it does on our electricians page.