Part P Explained: What Electrical Work Is Notifiable in England?

Part P of the Building Regulations explained: which electrical work in homes is notifiable, such as new circuits and consumer units, and who can self-certify.

3 min read · 20 November 2026 · RoomPlot Team

"Can I do my own electrical work?" is one of the most common home electrical questions. In England, the answer depends on Part P of the Building Regulations, which covers electrical safety in dwellings and decides which jobs must be notified to building control. Here it is in plain English.

ENGLAND, PART PNotifiable or not? USUALLY NOTIFIABLE Installing a new circuit Replacing a consumer unit New work in a room with a bath or shower USUALLY NOT NOTIFIABLE Replacing a socket, switch or fitting like for like Repairing a damaged cable Adding a point to an existing circuit, outside special locations
Usually notifiable, and usually not.

Key takeaways

  • Part P of the Building Regulations covers electrical safety in homes in England.
  • New circuits, consumer unit replacements and new work in bathroom special locations are notifiable.
  • Like-for-like replacements and most additions to existing circuits are not.
  • A registered electrician can self-certify notifiable work.

Usually notifiable

  • Installing a new circuit.
  • Replacing a consumer unit.
  • New work in a room containing a bath or shower, a special location.

Usually not notifiable

  • Replacing sockets, switches or light fittings like for like.
  • Repairing a damaged cable.
  • Adding a point to an existing circuit, outside special locations.

Even work that is not notifiable must still be done safely and to BS 7671.

How notification works

Approved Document P describes three routes for notifiable work:

  1. A registered competent person, who self-certifies the work.
  2. Third-party certification by a registered certifier.
  3. Building control, by applying to the local authority before work starts.

Check the rules. This applies to England. Wales has its own version of Part P, and Scotland and Northern Ireland have different building standards. Check the current Approved Document P.

Plans help with every route

Whichever route is used, a clear plan of the new circuits and points makes the paperwork easier and gives the homeowner a record of what was done.

Frequently asked questions

Can I do my own electrical work?

You can do non-notifiable work if you are competent, and it must still meet BS 7671. Notifiable work has to be certified through one of the approved routes.

What happens if notifiable work is not notified?

The local authority can require it to be put right, and missing certificates cause problems when the property is sold.

Does Part P apply in Scotland?

No. Scotland has its own building standards system, and Wales has its own version of Part P.

Free lesson. Want the full picture? UK rules for electrical plans is part of our free electrical floor plans course, with interactive exercises.

Sources

Plan it on your phone. Draw the new circuits and points so the certificate and the plan tell the same story. Download RoomPlot on the App Store and draw your first electrical plan in minutes, or see what it does on our electricians page.

Related guides

Electricians AFCI Requirements Explained: Which Rooms Need Arc-Fault Protection AFCI protection explained for US homes: what an arc fault is, the NEC 210.12 room list, what happens when you extend a circuit and how to plan it. 3 min read Electricians Consumer Unit Replacement in the UK: What Is Involved and What a Good Quote Includes Replacing a fuse box in the UK: what a modern consumer unit includes, the testing and certificates involved, Part P notification and how a circuit plan helps. 4 min read Electricians Cooker Circuit Guide: Cable Size, Diversity and the Cooker Switch UK cooker circuits explained: how diversity turns a 12 kW cooker into a 32 A circuit, typical cable sizes, where the cooker switch goes and how to draw it. 3 min read