Lesson 1 of 11 All lessons
- 1Maximum demand and diversity
- 2Cable sizing and correction factors
- 3Fault protection, Zs and disconnection times
- 4US load calculations and wire sizing
- 5Three-phase supplies and load balancing
- 6Sub-mains and distribution boards
- 7Multi-storey plans, risers and fire stopping
- 8Solar PV and battery storage on the plan
- 9Data, alarm and power segregation
- 10Inspection records on plans
- 11Final test: advanced electrical floor plans
In this lesson
- Maximum demand is the realistic peak current after diversity.
- Diversity reduces lighting, second socket circuits and cookers, but not showers or EV chargers.
- If the total beats the supply fuse, plan load management or an upgrade.
Every new big load starts with one question: can the supply take it? Maximum demand answers it. In this lesson you build a demand calculation for a real house and test what happens when the client wants a shower, an immersion heater and an EV charger as well.
Connected load and diversity
The connected load is the sum of every rating. Real homes never draw that much at once, so designers apply diversity. Typical allowances from IET guidance: lighting at about two thirds, the largest socket circuit at 100% and the others at 40%, and a cooker at 10 A plus 30% of the rest, plus 5 A for a socket on the control unit.
Loads with no diversity
Instantaneous water heaters such as showers count the largest at 100%. Storage heaters, storage water heaters and EV chargers get no diversity at all. An EV charger only stops counting in full when load management controls it.
Compare with the supply
Most UK homes have a 60, 80 or 100 A main fuse. Write the result and the fuse rating next to the consumer unit on the plan, so the next person sees the decision.
Try it
Pick a house you know. List its circuits from the consumer unit labels and estimate the maximum demand with the allowances above.