In this lesson
- One sheet per floor, at the same scale and orientation.
- Vertical routes go through a planned riser or a few defined points.
- Every penetration through a fire-resisting floor or wall must be sealed.
On one floor, every cable is on one sheet. Add floors and the plan needs a system: a sheet per floor, a clear riser and markers that link the sheets.
A sheet per floor
Keep the same scale and orientation on every floor. A riser then sits in the same place on each sheet, and a reader finds vertical routes instantly.
Risers and boards
In flats and commercial buildings, sub-mains rise in a shaft to a board on each floor or in each unit. In houses, vertical runs follow a stud wall, a boxed pipe run or the airing cupboard.
Fire stopping and support
Seal every hole a cable makes through a fire-resisting floor or wall, and mark it on the plan so it can be checked. Support long vertical runs so their weight does not strain the terminations.
Try it
Place the fire-stopping seals on the section drawing above.