Module 3 · Special systems and records · Lesson 8 of 11

Solar PV and battery storage on the plan

Free advanced lesson: DC and AC routes, isolators, meters and labels for solar PV, where a home battery can go, and the UK and US connection rules.

9 min · 0 XP · 0 of 11 lessons done

Lesson 8 of 11 All lessons
  1. 1Maximum demand and diversity
  2. 2Cable sizing and correction factors
  3. 3Fault protection, Zs and disconnection times
  4. 4US load calculations and wire sizing
  5. 5Three-phase supplies and load balancing
  6. 6Sub-mains and distribution boards
  7. 7Multi-storey plans, risers and fire stopping
  8. 8Solar PV and battery storage on the plan
  9. 9Data, alarm and power segregation
  10. 10Inspection records on plans
  11. 11Final test: advanced electrical floor plans

In this lesson

  • Draw DC and AC routes in different styles: DC from panels is live in daylight.
  • Show every isolator, the generation meter and the second-supply labels.
  • Batteries stay out of sleeping rooms and escape routes.

Solar panels and batteries add a second source of power. The plan has to show where it comes from, how it is switched off and where the battery can safely live.

NOT HERE: SLEEPING ROOM ESCAPE ROUTE POSSIBLE BATTERY SPOT DC isolatorInverterBatteryAC isolatorGen meter From the roof arrayKitchen Bathroom Bedroom Garage Solar PV and battery Where things go, and where they don't CABLES AND AREAS DC cable from the array Dashed: live in daylight AC cable to the consumer unit Through the AC isolator Unsuitable battery locations Sleeping rooms, escape routes Possible location Fire separation and detection SYMBOLS Consumer Unit
DC from the roof to an inverter and battery in the garage, AC to the consumer unit.

What to draw

  • The array, as a note if it is on the roof, and the DC route to the inverter.
  • The inverter with its DC isolator, and the AC route through an AC isolator to the board.
  • The generation meter, export limiting if used, and warning labels at the board and meter.
  • The battery, its location and its fire separation.

Connection rules

In the UK, systems up to 16 A per phase usually follow G98: install, then notify within 28 days. Larger ones follow G99 and need approval first. In the US, rooftop PV needs rapid shutdown under NEC 690.12.

Try it

Sort the battery locations above into suitable and unsuitable.

Check your understanding

Official documents and further reading

Progress is saved in this browser.

Go deeper: related guides

Electricians Where Can a Home Battery Go? PAS 63100 in Plain English PAS 63100:2024 explained: where home battery storage should and should not be installed, such as bedrooms and escape routes, shown on a floor plan. 3 min read Electricians Plug-In Solar Is Now Legal in Great Britain: The Rules Explained Plug-in balcony solar became legal in Great Britain on 27 August 2026: the 800 W limit, one device per home, permissions and what electricians should know. 3 min read