Module 2 · Distribution and layout · Lesson 6 of 11

Sub-mains and distribution boards

Free advanced lesson: when to add a sub-board, how to size and protect a sub-main, selectivity, earthing for outbuildings, and how to draw it all.

8 min · 0 XP · 0 of 11 lessons done

Lesson 6 of 11 All lessons
  1. 1Maximum demand and diversity
  2. 2Cable sizing and correction factors
  3. 3Fault protection, Zs and disconnection times
  4. 4US load calculations and wire sizing
  5. 5Three-phase supplies and load balancing
  6. 6Sub-mains and distribution boards
  7. 7Multi-storey plans, risers and fire stopping
  8. 8Solar PV and battery storage on the plan
  9. 9Data, alarm and power segregation
  10. 10Inspection records on plans
  11. 11Final test: advanced electrical floor plans

In this lesson

  • A sub-board suits outbuildings, large extensions and areas with several circuits.
  • Size the sub-main for the sub-board's demand and the full route length.
  • Plan selectivity, so a fault on the sub-board does not trip the main board.

A sub-distribution board is a second consumer unit fed from the first. It gives a garage, workshop or outbuilding its own isolation and circuits, and keeps long final circuits off the main board.

PATIO GARDEN Desk Earth rod SWA House Garden office Garden office supply A sub-main to its own consumer unit Armoured sub-main, buried From the house consumer unit Office sockets Radial from the office unit Office lighting Earth rod, if designed as TT A design decision on PME supplies Connection (switch to light) SYMBOLS Consumer Unit Surface ceiling light Double socket One-way switch
An armoured sub-main to a small board in an outbuilding.

Sizing the sub-main

Add up the demand of everything the sub-board will feed, apply the correction factors for the route, and check voltage drop over the whole length. Long garden runs are often decided by voltage drop.

Selectivity

The device that protects the sub-main should not trip before the devices on the sub-board. Pick ratings and types so a fault only switches off the circuit it is on.

Earthing

For a detached building on a PME supply, the designer decides whether to extend the earth or make the outbuilding a TT installation with its own electrode and RCD protection.

Drawing it

Draw the sub-main as its own route, give the sub-board its own circuit names, and keep one schedule per board.

Try it

Sketch a detached garage and draw the sub-main route from your consumer unit. How long is it?

Check your understanding

Official documents and further reading

Progress is saved in this browser.

Go deeper: related guides

Electricians Garden Office Electrics: How to Plan the Supply in the UK Planning power for a garden office in the UK: armoured cable, the sub-main and consumer unit, the earthing decision, Part P notification and a plan example. 4 min read Electricians Garden Electrics Plan: Outdoor Lights, Sockets and a Shed Plan garden electrics: outdoor wall and path lights, a weatherproof socket and an armoured cable to a shed, with RCD protection, drawn on a plan. 3 min read