  1. 1Maximum demand and diversity
  2. 2Cable sizing and correction factors
  3. 3Fault protection, Zs and disconnection times
  4. 4US load calculations and wire sizing
  5. 5Three-phase supplies and load balancing
  6. 6Sub-mains and distribution boards
  7. 7Multi-storey plans, risers and fire stopping
  8. 8Solar PV and battery storage on the plan
  9. 9Data, alarm and power segregation
  10. 10Inspection records on plans
  11. 11Final test: advanced electrical floor plans

In this lesson

  • Keep parallel runs apart or use a barrier.
  • Cross at right angles, and use compartmented trunking when routes are shared.
  • Give data and alarm cables their own colour and line style on the plan.

Data and alarm cables carry small signals at low voltage. Running them alongside mains cables risks interference and, if insulation fails, danger. Planning the separation costs nothing; fixing it later costs a lot.

SEGREGATIONKeeping data and power apart Running side by sideKeep a gap, or use a barrier 50 mm CrossingCross at right angles 90° Shared trunkingSeparate compartments PowerData UK: BS 7671 and BS EN 50174-2 set the distances. US: NEC 800.133 asks for 2 in (50 mm) unless in a raceway or behind a barrier.
Three ways to keep data and power apart.

The principles

  • Keep a gap on parallel runs, commonly around 50 mm, or use a barrier or metal containment.
  • Cross at right angles.
  • Use separate compartments in shared trunking.

The rules

In the UK, BS 7671 requires separation between circuits of different voltage bands, and BS EN 50174-2 gives distances for data cabling. In the US, NEC 800.133 asks for 2 in (50 mm) unless a raceway or listed barrier separates them.

Try it

Sort the installation details above: which are fine as drawn, and which need separation or a barrier?

Check your understanding

Official documents and further reading

Progress is saved in this browser.

Go deeper: related guides

Electricians Home Network Cabling Plan: Cat6 Done Right Plan home network cabling: Cat6 in a star from one cabinet to data outlets and ceiling Wi-Fi access points, with routes kept apart from mains cable. 3 min read Electricians Smart Home Wiring Plan: What to Build In Before You Plaster Plan smart home wiring before plastering: neutrals at switches, deep back boxes, Cat6 to TVs and access points, and a home for the network cabinet. 3 min read