Lesson 17 of 18 All lessons
- 1What an electrical floor plan is, and who uses it
- 2Electrical symbols: lights, switches, sockets and distribution
- 3Circuits explained: lighting, rings, radials and dedicated supplies
- 4Drawing the base plan: measuring, doors and fixed fittings
- 5Lighting and switching: one-way, two-way and intermediate
- 6Sockets and spurs: how many, where, and on which circuit
- 7Kitchens and bathrooms: special rules for special rooms
- 8Cable routes, lengths and circuit schedules
- 9Dedicated circuits: showers, cookers, EV chargers and outbuildings
- 10UK rules: BS 7671, Part P and what applies where
- 11UK protection: consumer units, RCD types and surge protection
- 12UK earthing systems, mounting heights and certificates
- 13US rules: the NEC, receptacle spacing, GFCI and AFCI
- 14US kitchens and bathrooms: receptacle rules on the plan
- 15US panels, GFCI, AFCI and wire sizes
- 16Worked example: from survey to a finished plan
- 17Checking your plan and handing it over
- 18Final test: check what you have learned
In this lesson
- Check switching, circuits, symbols and legend before you share.
- Update the plan during the job so the as-installed version is ready.
- Hand over the plan with the certificate and schedule.
A plan is only useful if it is right. This last lesson gives you a checklist and shows what to hand over at the end of a job.
Checklist before you share
- Every light has a switch, and every switch has a connection.
- Every point belongs to a circuit, and every circuit returns to the board.
- One symbol style per device, and every symbol in the legend.
- Switches on the latch side of doors, sockets where the furniture is.
- Kitchen and bathroom rules followed.
- Circuit names match the schedule.
Common beginner mistakes
- Placing symbols before the furniture and fittings.
- Drawing cables straight across rooms.
- Forgetting outdoor lights, alarms and data.
- Using the plan's circuit colours as if they were conductor colours.
Handover
Give the client the as-installed plan, the circuit schedule, the certificate and any notification, plus manuals. Keep a copy: it makes the next job, or the next inspection, much faster.
One step left: the final test in the next lesson. Then keep practising on real rooms, and use the guides linked in each lesson to go deeper.