Lesson 12 of 18 All lessons
- 1What an electrical floor plan is, and who uses it
- 2Electrical symbols: lights, switches, sockets and distribution
- 3Circuits explained: lighting, rings, radials and dedicated supplies
- 4Drawing the base plan: measuring, doors and fixed fittings
- 5Lighting and switching: one-way, two-way and intermediate
- 6Sockets and spurs: how many, where, and on which circuit
- 7Kitchens and bathrooms: special rules for special rooms
- 8Cable routes, lengths and circuit schedules
- 9Dedicated circuits: showers, cookers, EV chargers and outbuildings
- 10UK rules: BS 7671, Part P and what applies where
- 11UK protection: consumer units, RCD types and surge protection
- 12UK earthing systems, mounting heights and certificates
- 13US rules: the NEC, receptacle spacing, GFCI and AFCI
- 14US kitchens and bathrooms: receptacle rules on the plan
- 15US panels, GFCI, AFCI and wire sizes
- 16Worked example: from survey to a finished plan
- 17Checking your plan and handing it over
- 18Final test: check what you have learned
In this lesson
- TN-S, TN-C-S (PME) and TT describe where the earth connection comes from.
- New homes in England: sockets and switches between 450 and 1200 mm, consumer unit switches at 1350 to 1450 mm.
- New circuits get an EIC, small alterations a Minor Works Certificate, inspections an EICR.
Three practical topics round off the UK track: where the earth comes from, how high things are mounted, and which piece of paper each job ends with. All three belong in the notes on your plan.
Earthing systems
- TN-S: a separate earth from the supplier, usually the cable sheath.
- TN-C-S (PME): neutral and earth are combined in the supply and split at the service head.
- TT: no earth from the supplier. The installation has its own electrode and relies on RCDs.
The system matters for EV chargers and outbuildings, so note it beside the consumer unit on the plan. Never open the service head: it belongs to the network operator.
Mounting heights
The figures come from Approved Document M, not from BS 7671. They apply to new homes and new building work. A rewire of an existing house does not have to follow them, but most people choose to. Write the heights as a note on the plan, because a plan cannot show them.
Certificates
Notifiable work in England, such as a new circuit or a consumer unit change, also gets a Building Regulations compliance certificate, normally arranged through the electrician's competent person scheme.
Scotland, Wales and Northern Ireland have their own building standards. Check the document for your nation.
Try it